LOAD CENTER PLATFORM

Category
Chute
About This Project

It is a peripheral structure of the SAG discharge mill, which fulfills the function of centering the discharge of the product into the tank in an equidistant manner. With this technology the accumulation of thick materials in the pumps is avoided, delaying their wear.

Currently the download centering platform has been operating in Minera Centinela since 2015 and in Minera Chinalco in Peru, since 2016.

The manufacturing and assembly was carried out in Chile and then taken to Peru, where it was assembled through the field advisory service. Today, new project facilities can be made from the Siom Peru plant.

CHARACTERISTICS:
31 × 31 quick fix ceramic rubber coating
Modular platform for container transfer 40 feet
Rubberized steel structure to prevent corrosion

WHERE THEY ARE:
Chinalco (PERÚ)
Centinela (CHILE)

FOR MORE INFORMATION:
Nicolas Buschmann Velásquez
Engineering manager
nbuschmann@siom-mineria.com
M: (+56 9) 78974839
Chile (+56 2) 23718142
Perú (+51) 13265400